Scope of Works: The scope of work was to upgrade one unit and install a new steel air conditioning platform which included –

  • Decommissioning, disconnection and removal of 3 package units off the roof
  • Removal of existing rotten timber platform
  • Installation of a new steel platform to hold all units
  • Installation of 1 new air cooled packaged unit and re-installation and recommissioning of 2 existing air cooled packaged units
  • New ducting for each unit

The project was completed in 2 days. It involved craning 3 package units down from the roof, removing the existing wooden platform and installing a new steel platform. One new unit and 2 existing package units were craned back up onto the new steel platform.